| Assessment Year | 2009 |
|---|---|
| Principal Product | plumbing fixtures |
| NAICS | 332913: Plumbing Fixture Fitting and Trim Manufacturing |
| SIC | 3432: Plumbing Fixture Fittings and Trim |
| Sales Range | $10 M to 50M |
| # of Employees | 114 |
| Plant Area |
65,000
ft2
|
| Annual Production | 96,000
pieces
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Delaware |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $105,827 | 663,920 |
kWh
|
$0.16 |
| Natural Gas | $38 | 2,556 |
MMBtu
|
$0.015 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,444 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,724 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7243: Improve air circulation with destratification fans / other methods | $9,690 | $18,300 | - | - |
$9,690
-
MMBtu
|
|
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $3,192 | - | - | - |
$3,192
-
MMBtu
|
|
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $5,472 | $3,500 | - | - |
$5,472
-
MMBtu
|
|
| 04 | 2.2437: Recover waste heat from equipment | $600 | $950 | - | - |
$600
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $960 | $2,000 |
$960
6,440
kWh
|
- | - | |
| 06 | 2.6211: Conserve energy by efficient use of vending machines | $470 | $510 |
$470
3,150
kWh
|
- | - | |
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,060 | - | - |
$1,060
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $21,444 | $25,260 |
$1,430
9,590
kWh
|
$1,060
-
kW-mo/yr
|
$18,954
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,724 | $3,500 | - |
$1,060
-
kW-mo/yr
|
$8,664
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs