ITAC Assessment: DL0032
ITAC logo
ITAC Assessment: DL0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Tufftape, Reinforced Carton Sealing Tapes, Box Tapes
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 100,000
ft2
Annual Production 15,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,906 1,858,491
kWh
Natural Gas $271,694 23,565
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,425

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1224: Replace boiler $30,400 $55,000 - $30,400
-
MMBtu
02 2.7314: Reduce ventilation air $19,700 $1,200 $1,200
12,000
kWh
$18,500
-
MMBtu
03 2.1223: Install smaller boiler (increase high fire duty cycle) $12,400 $7,000 - $12,400
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,639 $31,781 $9,639
76,499
kWh
-
05 2.2136: Install / repair insulation on steam lines $8,400 $7,500 - $8,400
-
MMBtu
06 2.1224: Replace boiler $6,100 $6,100 - $6,100
-
MMBtu
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,521 $643 $2,521
23,778
kWh
-
08 2.2163: Use minimum steam operating pressure $2,065 - - $2,065
-
MMBtu
TOTAL RECOMMENDED $91,225 $109,224 $13,360
112,277
kWh
$77,865
-
MMBtu
TOTAL IMPLEMENTED $48,425 $47,224 $13,360
112,277
kWh
$35,065
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs