Assessment Year | 2008 |
---|---|
Principal Product | Tufftape, Reinforced Carton Sealing Tapes, Box Tapes |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
100,000
ft2
|
Annual Production | 15,000,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $178,906 | 1,858,491 |
kWh
|
$0.096 |
Natural Gas | $271,694 | 23,565 |
MMBtu
|
$11.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,225 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,425 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $30,400 | $55,000 | - |
$30,400
-
MMBtu
|
|
02 | 2.7314: Reduce ventilation air | $19,700 | $1,200 |
$1,200
12,000
kWh
|
$18,500
-
MMBtu
|
|
03 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $12,400 | $7,000 | - |
$12,400
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,639 | $31,781 |
$9,639
76,499
kWh
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $8,400 | $7,500 | - |
$8,400
-
MMBtu
|
|
06 | 2.1224: Replace boiler | $6,100 | $6,100 | - |
$6,100
-
MMBtu
|
|
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,521 | $643 |
$2,521
23,778
kWh
|
- | |
08 | 2.2163: Use minimum steam operating pressure | $2,065 | - | - |
$2,065
-
MMBtu
|
|
TOTAL RECOMMENDED | $91,225 | $109,224 |
$13,360
112,277
kWh
|
$77,865
-
MMBtu
|
||
TOTAL IMPLEMENTED | $48,425 | $47,224 |
$13,360
112,277
kWh
|
$35,065
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs