| Assessment Year | 2008 |
|---|---|
| Principal Product | Aluminum Aerospace Technology Parts |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 55 |
| Plant Area |
25,000
ft2
|
| Annual Production | 4,000
pieces
|
| Production Hrs. Annual | 4,576
hrs
|
| Location (State) | Maryland |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $86,223 | 649,110 |
kWh
|
$0.13 |
| Electricity Demand | $5,719 | 179 |
kW-mo/yr
|
$31.95 |
| Natural Gas | $3,462 | 245 |
MMBtu
|
$14.13 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $65,852 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $34,699 | $15,303 |
$12,133
87,922
kWh
|
$22,566
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,750 | $3,000 |
$4,750
34,400
kWh
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,180 | - |
$4,180
30,270
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,663 | $64,508 |
$17,663
127,490
kWh
|
- | |
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $4,560 | - |
$4,560
33,050
kWh
|
- | |
| TOTAL RECOMMENDED | $65,852 | $82,811 |
$43,286
313,132
kWh
|
$22,566
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs