ITAC Assessment: DL0021
ITAC logo
ITAC Assessment: DL0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Aluminum Aerospace Technology Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 25,000
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 4,576
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,223 649,110
kWh
Electricity Demand $5,719 179
kW-mo/yr
Natural Gas $3,462 245
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $34,699 $15,303 $12,133
87,922
kWh
$22,566
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,750 $3,000 $4,750
34,400
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,180 - $4,180
30,270
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $17,663 $64,508 $17,663
127,490
kWh
-
05 2.7232: Replace existing hvac unit with high efficiency model $4,560 - $4,560
33,050
kWh
-
TOTAL RECOMMENDED $65,852 $82,811 $43,286
313,132
kWh
$22,566
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs