ITAC Assessment: DL0012
ITAC logo
ITAC Assessment: DL0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product noise control and thermal applications
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 76,000
ft2
Annual Production 1,500
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,925 913,000
kWh
Electricity Demand $39,575 199
kW-mo/yr
Electricity Fees $4,462 -
Natural Gas $33,705 2,472
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,003 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,593

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $27,593 $26,675 $27,047
245,880
kWh
$546
-
kW-mo/yr
- -
02 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $19,600 $23,900 - - $19,600
-
MMBtu
-
03 2.2531: Re-size charging openings or add movable cover or door $5,988 $146 - - $5,988
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $6,766 $16,500 - - $6,766
-
MMBtu
-
05 2.8114: Change rate schedules or other changes in utility service $3,154 - - - - $3,154
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,902 $11,000 $3,902
34,968
kWh
- - -
TOTAL RECOMMENDED $67,003 $78,221 $30,949
280,848
kWh
$546
-
kW-mo/yr
$32,354
-
MMBtu
$3,154
TOTAL IMPLEMENTED $27,593 $26,675 $27,047
245,880
kWh
$546
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs