ITAC Assessment: DL0007
ITAC logo
ITAC Assessment: DL0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product plastic parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 25,000
ft2
Annual Production 332,800
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,289 825,967
kWh
Fuel Oil #2 $8,832 605
MMBtu
Other Gas $1,425 69
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,368 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,713

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Other Gas Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $2,993 $2,583 $932
8,176
kWh
$1,314
-
MMBtu
$747
-
MMBtu
02 2.2437: Recover waste heat from equipment $2,672 $75 - $2,672
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,535 $140 $1,535
3,455
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $892 - $892
7,821
kWh
- -
05 2.7491: Insulate glazing, walls, ceilings, and roofs $181 $34 $181
1,586
kWh
- -
06 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $209 $2,634 - $209
-
MMBtu
-
07 2.1224: Replace boiler $1,325 $10,425 - $1,325
-
MMBtu
-
08 2.3511: Use plant owned transformers or lease transformers $2,561 $28,000 $2,561
22,464
kWh
- -
TOTAL RECOMMENDED $12,368 $43,891 $6,101
43,502
kWh
$5,520
-
MMBtu
$747
-
MMBtu
TOTAL IMPLEMENTED $5,713 $10,674 $1,716
5,041
kWh
$3,997
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs