| Assessment Year | 2023 |
|---|---|
| Principal Product | Injection Molding/Composite Materials |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 136 |
| Plant Area |
110,000
ft2
|
| Annual Production | 26,000,000
lb
|
| Production Hrs. Annual | 8,640
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $948,633 | 9,196,500 |
kWh
|
$0.10 | |
| Natural Gas | $33,653 | 5,557 |
MMBtu
|
$6.06 | |
| Waste Disposal Costs | |||||
| Water Usage | $27,117 | 3,161 |
Tgal
|
$8.58 | |
| TOTAL YEARLY COSTS | $1,009,403 | ||||
| RECOMMENDED SAVINGS* | $82,439 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $10,973 | $2,300 |
$10,973
106,380
kWh
|
- | - | |
| 02 | 2.7492: Use proper thickness of insulation on building envelope | $21,901 | $86,580 | - |
$21,901
-
MMBtu
|
- | |
| 03 | 2.4322: Use or replace with energy efficient substitutes | $20,343 | $37,000 |
$20,343
197,218
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $951 | $180 |
$951
9,217
kWh
|
- | - | |
| 05 | 2.1321: Replace fossil fuel equipment with electrical equipment | $10,872 | $21,000 | - | - | $10,872 | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,398 | $72,618 |
$17,398
168,667
kWh
|
- | - | |
| TOTAL RECOMMENDED | $82,439 | $219,678 |
$49,665
481,482
kWh
|
$21,901
-
MMBtu
|
$10,872 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs