ITAC Assessment: CW0129
ITAC logo
ITAC Assessment: CW0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Injection Molding/Composite Materials
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 136
Plant Area 110,000
ft2
Annual Production 26,000,000
lb
Production Hrs. Annual 8,640
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $948,633 9,196,500
kWh
Natural Gas $33,653 5,557
MMBtu
Waste Disposal Costs
Water Usage $27,117 3,161
Tgal
TOTAL YEARLY COSTS $1,009,403
RECOMMENDED SAVINGS* $82,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7135: Install occupancy sensors $10,973 $2,300 $10,973
106,380
kWh
- -
02 2.7492: Use proper thickness of insulation on building envelope $21,901 $86,580 - $21,901
-
MMBtu
-
03 2.4322: Use or replace with energy efficient substitutes $20,343 $37,000 $20,343
197,218
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $951 $180 $951
9,217
kWh
- -
05 2.1321: Replace fossil fuel equipment with electrical equipment $10,872 $21,000 - - $10,872
06 2.7142: Utilize higher efficiency lamps and/or ballasts $17,398 $72,618 $17,398
168,667
kWh
- -
TOTAL RECOMMENDED $82,439 $219,678 $49,665
481,482
kWh
$21,901
-
MMBtu
$10,872
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs