ITAC Assessment: CW0120
ITAC logo
ITAC Assessment: CW0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Commercial and Military Aircraft Power Generation
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 130
Plant Area 44,000
ft2
Annual Production 13,000
units
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,614 1,432,500
kWh
Electricity Demand $56,540 5,040
kW-mo/yr
Electricity Fees $20,863 -
TOTAL YEARLY COSTS $145,018
RECOMMENDED SAVINGS* $1,085,605 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,085,605

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 4.652: Replace existing equipment with more suitable substitutes $30,000 $70,084 - - - - $30,000
02 4.651: Install back-up equipment $32,054 $93,000 - - $32,054 - -
03 2.3141: Use battery storage for demand control $18,089 $25,885 $18,089
383,250
kWh
- - - -
04 4.454: Modify startup/shutdown times $2,380 $100,000 $2,380
50,430
kWh
- - - -
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,965 $510 $191
4,053
kWh
$1,774
-
kW-mo/yr
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $899 - $899
19,049
kWh
- - - -
07 4.611: Begin a practice of predictive / preventative maintenance $1,000,000 $122,000 - - - $1,000,000 -
08 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $217 $86 $217
4,596
kWh
- - - -
TOTAL RECOMMENDED $1,085,605 $411,565 $21,777
461,377
kWh
$1,774
-
kW-mo/yr
$32,054 $1,000,000 $30,000
TOTAL IMPLEMENTED $1,085,605 $411,565 $21,777
461,377
kWh
$1,774
-
kW-mo/yr
$32,054 $1,000,000 $30,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs