ITAC Assessment: CO0744
ITAC logo
ITAC Assessment: CO0744
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Plastic biomedical components
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 13,120
ft2
Annual Production 120,000,000
pieces
Production Hrs. Annual 8,592
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,489 769,216
kWh
Electricity Demand $17,306 1,051
kW-mo/yr
Electricity Fees $3,861 -
Natural Gas $6,220 647
MMBtu
TOTAL YEARLY COSTS $89,876
RECOMMENDED SAVINGS* $304,985 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.9114: Use solar heat to make electricty $26,159 $136,687 $16,642
208,291
kWh
$1,706
-
kW-mo/yr
- $7,811 -
02 2.2437: Recover waste heat from equipment $881 $2,407 - - $881
-
MMBtu
- -
03 2.7111: Reduce illumination to minimum necessary levels $2,175 $7,076 $2,175
18,633
kWh
- - - -
04 2.7144: Install spectral reflectors / delamp $1,847 $9,768 $1,595
16,044
kWh
$252
-
kW-mo/yr
- - -
05 2.3192: Use fossil fuel powered generator during peak demand periods $210,000 $58,000 - - - - $210,000
06 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers $60,192 $4,219 $132
1,657
kWh
- - - $60,060
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,731 $3,276 $3,248
31,511
kWh
$483
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $304,985 $221,433 $23,792
276,136
kWh
$2,441
-
kW-mo/yr
$881
-
MMBtu
$7,811 $270,060
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs