ITAC Assessment: CO0730
ITAC logo
ITAC Assessment: CO0730
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Machined parts for semiconductor manufacturing equipment
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 77,912
ft2
Annual Production 90
units
Production Hrs. Annual 4,420
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,024 2,965,540
kWh
Electricity Demand $60,803 10,013
kW-mo/yr
Electricity Fees $1,986 -
Natural Gas $30,797 4,630
MMBtu
TOTAL YEARLY COSTS $208,610
RECOMMENDED SAVINGS* $27,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,590 $1,680 $7,040
175,800
kWh
$1,550
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,690 $20,770 $4,690
117,000
kWh
- - - -
03 2.2514: Cover open tanks $7,390 $12,880 - - $7,390
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,620 $11,750 $6,270
156,500
kWh
$1,560
-
kW-mo/yr
- $200 $(-1,410.0)
TOTAL RECOMMENDED $27,290 $47,080 $18,000
449,300
kWh
$3,110
-
kW-mo/yr
$7,390
-
MMBtu
$200 $(-1,410.0)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs