ITAC Assessment: CO0724
ITAC logo
ITAC Assessment: CO0724
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Vacuum lifting equipment
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 70,000
ft2
Annual Production 218,000
units
Production Hrs. Annual 4,576
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,671 1,001,400
kWh
Electricity Demand $36,865 3,952
kW-mo/yr
Electricity Fees $108 -
Natural Gas $8,760 1,501
MMBtu
TOTAL YEARLY COSTS $125,404
RECOMMENDED SAVINGS* $26,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,540 $830 $5,000
62,800
kWh
$1,540
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $1,100 $820 $840
10,600
kWh
$260
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,070 $60 $820
10,300
kWh
$250
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $17,300 $50,790 $11,870
149,200
kWh
$3,950
-
kW-mo/yr
$140 $1,340
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $330 $500 $280
3,600
kWh
$50
-
kW-mo/yr
- -
TOTAL RECOMMENDED $26,340 $53,000 $18,810
236,500
kWh
$6,050
-
kW-mo/yr
$140 $1,340
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs