| Assessment Year | 2016 |
|---|---|
| Principal Product | Vacuum lifting equipment |
| NAICS | 332216: Saw Blade and Handtool Manufacturing |
| SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
| Sales Range | $10 M to 50M |
| # of Employees | 135 |
| Plant Area |
70,000
ft2
|
| Annual Production | 218,000
units
|
| Production Hrs. Annual | 4,576
hrs
|
| Location (State) | Montana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $79,671 | 1,001,400 |
kWh
|
$0.080 |
| Electricity Demand | $36,865 | 3,952 |
kW-mo/yr
|
$9.33 |
| Electricity Fees | $108 | - |
|
- |
| Natural Gas | $8,760 | 1,501 |
MMBtu
|
$5.84 |
| TOTAL YEARLY COSTS | $125,404 | |||
| RECOMMENDED SAVINGS* | $26,340 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,540 | $830 |
$5,000
62,800
kWh
|
$1,540
-
kW-mo/yr
|
- | - | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $1,100 | $820 |
$840
10,600
kWh
|
$260
-
kW-mo/yr
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,070 | $60 |
$820
10,300
kWh
|
$250
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,300 | $50,790 |
$11,870
149,200
kWh
|
$3,950
-
kW-mo/yr
|
$140 | $1,340 | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $330 | $500 |
$280
3,600
kWh
|
$50
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $26,340 | $53,000 |
$18,810
236,500
kWh
|
$6,050
-
kW-mo/yr
|
$140 | $1,340 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs