ITAC Assessment: CO0715
ITAC logo
ITAC Assessment: CO0715
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bakery Products
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 31,600
ft2
Annual Production 16,640,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,738 1,599,360
kWh
Electricity Demand $76,811 3,513
kW-mo/yr
Electricity Fees $616 -
Natural Gas $69,667 11,820
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2626: Avoid frost formation on evaporators $6,920 $5,420 $6,920
162,200
kWh
- - - -
02 2.2628: Utilize a less expensive cooling method $3,300 $11,250 $1,940
45,600
kWh
$1,360
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,120 $130 $1,230
28,800
kWh
$890
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $1,460 $3,280 $830
19,400
kWh
$630
-
kW-mo/yr
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $760 $1,820 $370
8,600
kWh
$390
-
kW-mo/yr
- - -
06 2.8121: Apply for tax-free status for energy purchases $7,870 $500 - - - $7,870 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,710 $13,850 $2,790
65,500
kWh
$2,210
-
kW-mo/yr
$40 - $670
TOTAL RECOMMENDED $28,140 $36,250 $14,080
330,100
kWh
$5,480
-
kW-mo/yr
$40 $7,870 $670
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs