ITAC Assessment: CO0713
ITAC logo
ITAC Assessment: CO0713
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Toffee/Chocolate Candies
NAICS 311351: Chocolate and Confectionery Manufacturing from Cacao Beans
SIC 2064: Candy and Other Confectionery Products
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 52,876
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,354 2,203,351
kWh
Electricity Demand $106,514 4,839
kW-mo/yr
Electricity Fees $613 -
Natural Gas $26,742 5,146
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2626: Avoid frost formation on evaporators $4,350 $5,740 $4,350
102,900
kWh
- - - - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,340 $4,650 $1,740
41,000
kWh
$1,260
-
kW-mo/yr
$(-660.0)
-
MMBtu
- - -
03 2.4133: Use most efficient type of electric motors $1,930 $3,620 $1,100
26,000
kWh
$830
-
kW-mo/yr
- - - -
04 2.2511: Insulate bare equipment $290 $220 $80
2,000
kWh
$140
-
kW-mo/yr
$70
-
MMBtu
- - -
05 2.8121: Apply for tax-free status for energy purchases $8,650 $500 - - - - $8,650 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,400 $18,930 $1,040
24,500
kWh
$2,980
-
kW-mo/yr
- $20 - $360
TOTAL RECOMMENDED $21,960 $33,660 $8,310
196,400
kWh
$5,210
-
kW-mo/yr
$(-590.0)
-
MMBtu
$20 $8,650 $360
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs