ITAC Assessment: CO0710
ITAC logo
ITAC Assessment: CO0710
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Eye Glasses
NAICS 339115: Ophthalmic Goods Manufacturing
SIC 3851: Ophthalmic Goods
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 16,901
ft2
Annual Production 115,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,893 942,600
kWh
Electricity Demand $56,389 2,669
kW-mo/yr
Electricity Fees $600 -
Natural Gas $6,311 793
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4131: Size electric motors for peak operating efficiency $1,950 $3,660 $500
12,300
kWh
$1,450
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,710 $340 $560
13,700
kWh
$1,150
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $470 $60 $140
3,500
kWh
$330
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $370 $1,170 $210
5,200
kWh
$160
-
kW-mo/yr
TOTAL RECOMMENDED $4,500 $5,230 $1,410
34,700
kWh
$3,090
-
kW-mo/yr
TOTAL IMPLEMENTED $2,180 $400 $700
17,200
kWh
$1,480
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs