ITAC Assessment: CO0709
ITAC logo
ITAC Assessment: CO0709
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Perishable Foods
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 30,500
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,495 767,760
kWh
Electricity Demand $39,191 1,887
kW-mo/yr
Electricity Fees $586 -
Natural Gas $50,293 7,061
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,310 $1,000 $760
19,000
kWh
$550
-
kW-mo/yr
- - - -
02 2.2623: Minimize condenser cooling water temperature $960 $630 $560
14,000
kWh
$400
-
kW-mo/yr
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $840 $1,110 $490
12,100
kWh
$350
-
kW-mo/yr
- - - -
04 2.2626: Avoid frost formation on evaporators $380 $1,960 $380
9,600
kWh
- - - - -
05 2.4133: Use most efficient type of electric motors $260 $590 $150
3,800
kWh
$110
-
kW-mo/yr
- - - -
06 2.8121: Apply for tax-free status for energy purchases $4,560 $500 - - - - $4,560 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,300 $10,780 $2,270
56,700
kWh
$1,930
-
kW-mo/yr
- $160 - $(-60.0)
08 2.9111: Use solar heat to heat make-up air $1,160 $8,080 - - $1,160
-
MMBtu
- - -
TOTAL RECOMMENDED $13,770 $24,650 $4,610
115,200
kWh
$3,340
-
kW-mo/yr
$1,160
-
MMBtu
$160 $4,560 $(-60.0)
TOTAL IMPLEMENTED $10,170 $12,280 $3,030
75,700
kWh
$2,480
-
kW-mo/yr
- $160 $4,560 $(-60.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs