ITAC Assessment: CO0708
ITAC logo
ITAC Assessment: CO0708
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Manufactured Stone Veneers
NAICS 327991: Cut Stone and Stone Product Manufacturing
SIC 3281: Cut Stone and Stone Products
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 72,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 3,393
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,995 960,095
kWh
Electricity Demand $55,366 2,877
kW-mo/yr
Electricity Fees $4,762 -
Natural Gas $38,208 5,407
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,880 $460 $1,460
33,800
kWh
$2,420
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $2,260 $8,620 - - $2,260
-
MMBtu
-
03 2.8121: Apply for tax-free status for energy purchases $5,290 $500 - - - $5,290
TOTAL RECOMMENDED $11,430 $9,580 $1,460
33,800
kWh
$2,420
-
kW-mo/yr
$2,260
-
MMBtu
$5,290
TOTAL IMPLEMENTED $9,170 $960 $1,460
33,800
kWh
$2,420
-
kW-mo/yr
- $5,290
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs