ITAC Assessment: CO0705
ITAC logo
ITAC Assessment: CO0705
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Packaged vegetables
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 103,400
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,953
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,403 1,154,800
kWh
Electricity Demand $73,209 4,576
kW-mo/yr
Electricity Fees $3,120 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2626: Avoid frost formation on evaporators $15,730 $21,000 $7,430
129,200
kWh
$8,300
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $3,760 $16,370 $2,700
47,000
kWh
$1,060
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,400 $19,210 $2,580
44,800
kWh
$2,300
-
kW-mo/yr
$120 $400
TOTAL RECOMMENDED $24,890 $56,580 $12,710
221,000
kWh
$11,660
-
kW-mo/yr
$120 $400
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs