ITAC Assessment: CO0702
ITAC logo
ITAC Assessment: CO0702
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Retail Display Fixtures
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 86,700
ft2
Annual Production 126,000
pieces
Production Hrs. Annual 2,741
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,356 1,729,920
kWh
Electricity Demand $91,335 5,547
kW-mo/yr
Electricity Fees $2,012 -
Natural Gas $26,754 3,388
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $7,850 $20,000 - $7,850
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,630 $950 $4,000
67,600
kWh
$2,630
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,680 $42,100 $10,660
180,100
kWh
$4,610
-
kW-mo/yr
$100 - $310
04 2.8121: Apply for tax-free status for energy purchases $5,480 $500 - - - $5,480 -
TOTAL RECOMMENDED $35,640 $63,550 $14,660
247,700
kWh
$15,090
-
kW-mo/yr
$100 $5,480 $310
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs