Assessment Year | 2015 |
---|---|
Principal Product | Roofing Asphalt |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 12 |
Plant Area |
43,560
ft2
|
Annual Production | 400,000
lb
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $26,007 | 577,920 |
kWh
|
$0.045 |
Electricity Demand | $60,295 | 2,854 |
kW-mo/yr
|
$21.13 |
Electricity Fees | $606 | - |
|
- |
Natural Gas | $130,964 | 21,872 |
MMBtu
|
$5.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,570 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,760 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $32,810 | $82,650 |
$8,860
197,600
kWh
|
$23,950
-
kW-mo/yr
|
- | - | - | |
02 | 2.2511: Insulate bare equipment | $19,610 | $20,000 | - | - |
$19,610
-
MMBtu
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,920 | $3,750 |
$1,240
27,700
kWh
|
$2,680
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,230 | $2,460 |
$660
14,800
kWh
|
- | - | $120 | $450 | |
TOTAL RECOMMENDED | $57,570 | $108,860 |
$10,760
240,100
kWh
|
$26,630
-
kW-mo/yr
|
$19,610
-
MMBtu
|
$120 | $450 | ||
TOTAL IMPLEMENTED | $24,760 | $26,210 |
$1,900
42,500
kWh
|
$2,680
-
kW-mo/yr
|
$19,610
-
MMBtu
|
$120 | $450 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs