ITAC Assessment: CO0701
ITAC logo
ITAC Assessment: CO0701
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Roofing Asphalt
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 12
Plant Area 43,560
ft2
Annual Production 400,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,007 577,920
kWh
Electricity Demand $60,295 2,854
kW-mo/yr
Electricity Fees $606 -
Natural Gas $130,964 21,872
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,760

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $32,810 $82,650 $8,860
197,600
kWh
$23,950
-
kW-mo/yr
- - -
02 2.2511: Insulate bare equipment $19,610 $20,000 - - $19,610
-
MMBtu
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,920 $3,750 $1,240
27,700
kWh
$2,680
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,230 $2,460 $660
14,800
kWh
- - $120 $450
TOTAL RECOMMENDED $57,570 $108,860 $10,760
240,100
kWh
$26,630
-
kW-mo/yr
$19,610
-
MMBtu
$120 $450
TOTAL IMPLEMENTED $24,760 $26,210 $1,900
42,500
kWh
$2,680
-
kW-mo/yr
$19,610
-
MMBtu
$120 $450
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs