ITAC Assessment: CO0683
ITAC logo
ITAC Assessment: CO0683
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Data Storage Tape Decks
NAICS 334112: Computer Storage Device Manufacturing
SIC 3572: Computer Storage Devices
Sales Range $100
M
to 500
M
# of Employees 370
Plant Area 84,400
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 3,619
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,618 3,463,019
kWh
Electricity Demand $150,440 6,930
kW-mo/yr
Electricity Fees $1,266 -
Natural Gas $9,597 1,281
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,540 $21,440 $6,450
134,700
kWh
$8,240
-
kW-mo/yr
$290 $1,560
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,750 $13,140 $7,870
164,400
kWh
$4,880
-
kW-mo/yr
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $8,270 - $4,770
99,600
kWh
$3,500
-
kW-mo/yr
- -
04 2.2691: Shut off cooling if cold outside air will cool process $2,440 $6,450 $1,890
39,500
kWh
$550
-
kW-mo/yr
- -
TOTAL RECOMMENDED $40,000 $41,030 $20,980
438,200
kWh
$17,170
-
kW-mo/yr
$290 $1,560
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs