| Assessment Year | 2013 |
|---|---|
| Principal Product | Safety equipment |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
90,000
ft2
|
| Annual Production | 500,000
pieces
|
| Production Hrs. Annual | 2,730
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $61,997 | 1,590,720 |
kWh
|
$0.039 |
| Electricity Demand | $74,059 | 3,652 |
kW-mo/yr
|
$20.28 |
| Electricity Fees | $1,824 | - |
|
- |
| Natural Gas | $4,732 | 539 |
MMBtu
|
$8.78 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,850 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,230 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,910 | $360 |
$2,330
57,500
kWh
|
$1,580
-
kW-mo/yr
|
- | - | |
| 02 | 2.7231: Use radiant heater for spot heating | $1,740 | $1,320 |
$550
13,700
kWh
|
$600
-
kW-mo/yr
|
$60 | $530 | |
| 03 | 2.7229: Air condition only space necessary | $9,040 | $500 |
$4,810
119,000
kWh
|
$4,230
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,450 | $15,070 |
$1,930
44,200
kWh
|
$4,460
-
kW-mo/yr
|
$70 | $(-10.0) | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $710 | $4,160 |
$540
12,800
kWh
|
- | $100 | $70 | |
| TOTAL RECOMMENDED | $21,850 | $21,410 |
$10,160
247,200
kWh
|
$10,870
-
kW-mo/yr
|
$230 | $590 | ||
| TOTAL IMPLEMENTED | $17,230 | $16,890 |
$7,290
176,900
kWh
|
$9,290
-
kW-mo/yr
|
$130 | $520 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs