Assessment Year | 2013 |
---|---|
Principal Product | Brewed beverages |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $50 M to 100M |
# of Employees | 100 |
Plant Area |
34,000
ft2
|
Annual Production | 130,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $48,039 | 1,435,776 |
kWh
|
$0.033 |
Electricity Demand | $54,806 | 3,599 |
kW-mo/yr
|
$15.23 |
Electricity Fees | $948 | - |
|
- |
Natural Gas | $65,579 | 13,577 |
MMBtu
|
$4.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,510 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,630 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $3,450 | $14,200 |
$1,720
48,600
kWh
|
$1,730
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.2136: Install / repair insulation on steam lines | $2,660 | $1,620 | - | - |
$2,660
-
MMBtu
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $520 | - |
$210
6,000
kWh
|
$310
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $430 | $2,450 |
$260
7,500
kWh
|
$170
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.8121: Apply for tax-free status for energy purchases | $4,810 | - | - | - | - | - | $4,810 | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $640 | $3,450 |
$580
16,300
kWh
|
- | - | $40 | - | $20 | |
TOTAL RECOMMENDED | $12,510 | $21,720 |
$2,770
78,400
kWh
|
$2,210
-
kW-mo/yr
|
$2,660
-
MMBtu
|
$40 | $4,810 | $20 | ||
TOTAL IMPLEMENTED | $8,630 | $5,070 |
$790
22,300
kWh
|
$310
-
kW-mo/yr
|
$2,660
-
MMBtu
|
$40 | $4,810 | $20 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs