ITAC Assessment: CO0677
ITAC logo
ITAC Assessment: CO0677
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Brewed beverages
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 34,000
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,039 1,435,776
kWh
Electricity Demand $54,806 3,599
kW-mo/yr
Electricity Fees $948 -
Natural Gas $65,579 13,577
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2622: Replace existing chiller with high efficiency model $3,450 $14,200 $1,720
48,600
kWh
$1,730
-
kW-mo/yr
- - - -
02 2.2136: Install / repair insulation on steam lines $2,660 $1,620 - - $2,660
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $520 - $210
6,000
kWh
$310
-
kW-mo/yr
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $430 $2,450 $260
7,500
kWh
$170
-
kW-mo/yr
- - - -
05 2.8121: Apply for tax-free status for energy purchases $4,810 - - - - - $4,810 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $640 $3,450 $580
16,300
kWh
- - $40 - $20
TOTAL RECOMMENDED $12,510 $21,720 $2,770
78,400
kWh
$2,210
-
kW-mo/yr
$2,660
-
MMBtu
$40 $4,810 $20
TOTAL IMPLEMENTED $8,630 $5,070 $790
22,300
kWh
$310
-
kW-mo/yr
$2,660
-
MMBtu
$40 $4,810 $20
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs