ITAC Assessment: CO0676
ITAC logo
ITAC Assessment: CO0676
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Fiberglass Light Poles
NAICS 335129: Other Lighting Equipment Manufacturing
SIC 3648: Lighting Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 154,250
ft2
Annual Production 12,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,495 751,129
kWh
Electricity Demand $56,516 2,664
kW-mo/yr
Electricity Fees $628 -
Natural Gas $21,030 3,309
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,450 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $2,670 $2,740 $370
8,500
kWh
$2,300
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,020 $250 $520
11,900
kWh
$1,500
-
kW-mo/yr
- - - -
03 2.2135: Repair and eliminate steam leaks $730 $900 - - $730
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,190 $3,000 $940
21,800
kWh
$2,010
-
kW-mo/yr
- $120 - $120
05 2.8121: Apply for tax-free status for energy purchases $2,840 $500 - - - - $2,840 -
TOTAL RECOMMENDED $11,450 $7,390 $1,830
42,200
kWh
$5,810
-
kW-mo/yr
$730
-
MMBtu
$120 $2,840 $120
TOTAL IMPLEMENTED $8,780 $4,650 $1,460
33,700
kWh
$3,510
-
kW-mo/yr
$730
-
MMBtu
$120 $2,840 $120
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs