Assessment Year | 2013 |
---|---|
Principal Product | Pumps and compressors |
NAICS | 333911: Pump and Pumping Equipment Manufacturing |
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $100 M to 500M |
# of Employees | 429 |
Plant Area |
191,000
ft2
|
Annual Production | 4,200
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $289,934 | 7,588,875 |
kWh
|
$0.038 |
Electricity Demand | $459,742 | 25,945 |
kW-mo/yr
|
$17.72 |
Electricity Fees | $15,758 | - |
|
- |
Natural Gas | $44,384 | 6,984 |
MMBtu
|
$6.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,100 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,980 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $21,220 | $50,000 | - |
$21,220
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $2,950 | $17,590 |
$1,760
49,800
kWh
|
$1,190
-
kW-mo/yr
|
- | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,460 | $11,450 |
$720
20,300
kWh
|
$740
-
kW-mo/yr
|
- | - | - | |
04 | 2.7226: Use computer programs to optimize hvac performance | $13,790 | $35,250 |
$(-70.0)
(-1,900)
kWh
|
- |
$13,860
-
MMBtu
|
- | - | |
05 | 2.7226: Use computer programs to optimize hvac performance | $2,370 | $4,500 |
$960
27,100
kWh
|
- |
$1,410
-
MMBtu
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,120 | $15,820 |
$1,200
33,800
kWh
|
$920
-
kW-mo/yr
|
- | - | - | |
07 | 2.7132: Install timers on light switches in little used areas | $6,190 | $15,000 |
$5,330
150,500
kWh
|
- | - | $320 | $540 | |
TOTAL RECOMMENDED | $50,100 | $149,610 |
$9,900
279,600
kWh
|
$24,070
-
kW-mo/yr
|
$15,270
-
MMBtu
|
$320 | $540 | ||
TOTAL IMPLEMENTED | $47,980 | $133,790 |
$8,700
245,800
kWh
|
$23,150
-
kW-mo/yr
|
$15,270
-
MMBtu
|
$320 | $540 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs