ITAC Assessment: CO0666
ITAC logo
ITAC Assessment: CO0666
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Erosion and sediment control products
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2429: Special Product Sawmills, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 81,000
ft2
Annual Production 6,240
ton
Production Hrs. Annual 5,512
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,147 3,407,420
kWh
Electricity Demand $94,999 14,151
kW-mo/yr
Electricity Fees $5,349 -
Natural Gas $9,724 1,601
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,240 $155,860 $18,180
221,800
kWh
$7,060
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,710 $1,000 $4,590
60,100
kWh
$1,120
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $3,090 $430 $2,490
32,600
kWh
$600
-
kW-mo/yr
-
04 2.3212: Optimize plant power factor $30,160 $56,610 - $30,160
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $14,630 $32,970 $11,240
140,600
kWh
$3,290
-
kW-mo/yr
$210
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,730 $13,270 $7,110
90,500
kWh
$2,350
-
kW-mo/yr
$160
TOTAL RECOMMENDED $88,560 $260,140 $43,610
545,600
kWh
$44,580
-
kW-mo/yr
$370
TOTAL IMPLEMENTED $5,710 $1,000 $4,590
60,100
kWh
$1,120
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs