ITAC Assessment: CO0664
ITAC logo
ITAC Assessment: CO0664
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Portable Carnival Rides
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 88,410
ft2
Annual Production 35
pieces
Production Hrs. Annual 2,579
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,934 632,482
kWh
Electricity Demand $62,368 3,167
kW-mo/yr
Electricity Fees $2,080 -
Natural Gas $43,646 6,172
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,690 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,290

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $3,690 $10,600 $5,300
-
kW-mo/yr
$420 - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,660 $410 $1,910
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,630 $8,120 $1,940
-
kW-mo/yr
- $50 $(-130.0)
04 2.7135: Install occupancy sensors $1,710 $2,560 $1,150
-
kW-mo/yr
- $10 $40
TOTAL RECOMMENDED $10,690 $21,690 $10,300
-
kW-mo/yr
$420 $60 $(-90.0)
TOTAL IMPLEMENTED $5,290 $8,530 $3,850
-
kW-mo/yr
- $50 $(-130.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs