Assessment Year | 2012 |
---|---|
Principal Product | Processed meat products |
NAICS | 311611: Animal (except Poultry) Slaughtering |
SIC | 2011: Meat Packing Plants |
Sales Range | less than $500 k |
# of Employees | 900 |
Plant Area |
172,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $315,558 | 5,149,050 |
kWh
|
$0.061 |
Electricity Demand | $237,064 | 11,952 |
kW-mo/yr
|
$19.83 |
Electricity Fees | $1,742 | - |
|
- |
Natural Gas | $32,319 | 3,778 |
MMBtu
|
$8.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,840 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,090 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $9,430 | $850 |
$12,180
191,900
kWh
|
$520
-
kW-mo/yr
|
$(-3,270.0)
-
MMBtu
|
- | - | |
02 | 2.7135: Install occupancy sensors | $7,240 | $29,960 |
$6,680
105,300
kWh
|
- | - | $100 | $460 | |
03 | 2.7134: Use photocell controls | $6,600 | $4,680 |
$3,410
53,700
kWh
|
$2,920
-
kW-mo/yr
|
- | $50 | $220 | |
04 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $5,660 | $550 |
$480
7,500
kWh
|
$530
-
kW-mo/yr
|
$4,650
-
MMBtu
|
- | - | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $1,460 | $9,100 |
$1,000
15,700
kWh
|
$460
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $450 | $2,400 |
$120
1,900
kWh
|
$190
-
kW-mo/yr
|
- | $40 | $100 | |
TOTAL RECOMMENDED | $30,840 | $47,540 |
$23,870
376,000
kWh
|
$4,620
-
kW-mo/yr
|
$1,380
-
MMBtu
|
$190 | $780 | ||
TOTAL IMPLEMENTED | $15,090 | $1,400 |
$12,660
199,400
kWh
|
$1,050
-
kW-mo/yr
|
$1,380
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs