ITAC Assessment: CO0653
ITAC logo
ITAC Assessment: CO0653
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Consumer health care products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 244,561
ft2
Annual Production 4,700,000
pieces
Production Hrs. Annual 4,438
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,009 3,848,600
kWh
Electricity Demand $156,360 9,111
kW-mo/yr
Electricity Fees $828 -
Natural Gas $41,693 6,289
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,900 $31,760 $8,250
198,200
kWh
$2,650
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,630 $800 $1,740
41,700
kWh
$890
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $28,230 $91,620 $14,990
360,100
kWh
$12,350
-
kW-mo/yr
- $590 $300
04 2.7243: Improve air circulation with destratification fans / other methods $3,380 $25,810 $(-700.0)
(-16,800)
kWh
$(-240.0)
-
kW-mo/yr
$4,320
-
MMBtu
- -
TOTAL RECOMMENDED $45,140 $149,990 $24,280
583,200
kWh
$15,650
-
kW-mo/yr
$4,320
-
MMBtu
$590 $300
TOTAL IMPLEMENTED $2,630 $800 $1,740
41,700
kWh
$890
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs