ITAC Assessment: CO0652
ITAC logo
ITAC Assessment: CO0652
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Wood boards
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 41
Plant Area 15,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,505 1,371,815
kWh
Electricity Demand $85,385 7,813
kW-mo/yr
Electricity Fees $5,088 -
Natural Gas $1,470 161
MMBtu
Fuel Oil #2 $13,389 612
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,090

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.1336: Install equipment to utilize waste fuel $11,990 $34,320 - - $(-1,400.0)
-
MMBtu
$13,390
-
MMBtu
02 2.5195: Change product design to reduce energy requirements $7,570 $13,550 $3,230
54,300
kWh
$4,340
-
kW-mo/yr
- -
03 2.9111: Use solar heat to heat make-up air $7,530 $35,420 - - - $7,530
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,100 $870 $2,880
48,400
kWh
$1,220
-
kW-mo/yr
- -
TOTAL RECOMMENDED $31,190 $84,160 $6,110
102,700
kWh
$5,560
-
kW-mo/yr
$(-1,400.0)
-
MMBtu
$20,920
-
MMBtu
TOTAL IMPLEMENTED $16,090 $35,190 $2,880
48,400
kWh
$1,220
-
kW-mo/yr
$(-1,400.0)
-
MMBtu
$13,390
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs