Assessment Year | 2011 |
---|---|
Principal Product | Fabric tension structures |
NAICS | 314910: Textile Bag and Canvas Mills |
SIC | 2394: Canvas and Related Products |
Sales Range | $5 M to 10M |
# of Employees | 65 |
Plant Area |
76,000
ft2
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 2,871
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,908 | 587,440 |
kWh
|
$0.066 |
Electricity Demand | $27,670 | 3,278 |
kW-mo/yr
|
$8.44 |
Electricity Fees | $4,236 | - |
|
- |
Natural Gas | $43,931 | 4,591 |
MMBtu
|
$9.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,080 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.512: Condense operation into one building | $17,750 | $20,000 |
$1,520
66,200
kWh
|
$8,700
-
kW-mo/yr
|
$1,660 |
$5,870
-
MMBtu
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,300 | $110 |
$740
12,000
kWh
|
$560
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,530 | $31,210 |
$6,380
91,400
kWh
|
$2,920
-
kW-mo/yr
|
- | - | $130 | $100 | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $2,470 | $20,920 |
$(-260.0)
(-3,600)
kWh
|
$(-100.0)
-
kW-mo/yr
|
- |
$2,830
-
MMBtu
|
- | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $1,030 | $90 |
$570
9,300
kWh
|
$440
-
kW-mo/yr
|
- | - | $20 | - | |
TOTAL RECOMMENDED | $32,080 | $72,330 |
$8,950
175,300
kWh
|
$12,520
-
kW-mo/yr
|
$1,660 |
$8,700
-
MMBtu
|
$150 | $100 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs