ITAC Assessment: CO0651
ITAC logo
ITAC Assessment: CO0651
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Fabric tension structures
NAICS 314910: Textile Bag and Canvas Mills
SIC 2394: Canvas and Related Products
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 76,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 2,871
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,908 587,440
kWh
Electricity Demand $27,670 3,278
kW-mo/yr
Electricity Fees $4,236 -
Natural Gas $43,931 4,591
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.512: Condense operation into one building $17,750 $20,000 $1,520
66,200
kWh
$8,700
-
kW-mo/yr
$1,660 $5,870
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,300 $110 $740
12,000
kWh
$560
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,530 $31,210 $6,380
91,400
kWh
$2,920
-
kW-mo/yr
- - $130 $100
04 2.7243: Improve air circulation with destratification fans / other methods $2,470 $20,920 $(-260.0)
(-3,600)
kWh
$(-100.0)
-
kW-mo/yr
- $2,830
-
MMBtu
- -
05 2.7111: Reduce illumination to minimum necessary levels $1,030 $90 $570
9,300
kWh
$440
-
kW-mo/yr
- - $20 -
TOTAL RECOMMENDED $32,080 $72,330 $8,950
175,300
kWh
$12,520
-
kW-mo/yr
$1,660 $8,700
-
MMBtu
$150 $100
TOTAL IMPLEMENTED - - - - - - - -