ITAC Assessment: CO0642
ITAC logo
ITAC Assessment: CO0642
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Asphalt plants, tanks and heaters
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 84
Plant Area 196,000
ft2
Annual Production 12
pieces
Production Hrs. Annual 2,817
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,454 804,384
kWh
Electricity Demand $18,712 4,051
kW-mo/yr
Electricity Fees $3,766 -
Natural Gas $85,175 10,869
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,850 $12,690 $9,480
88,900
kWh
$2,150
-
kW-mo/yr
$80 - $140
02 2.9114: Use solar heat to make electricty $4,300 $27,000 $1,820
15,600
kWh
$340
-
kW-mo/yr
- $2,140 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,530 $4,090 $2,040
17,500
kWh
$490
-
kW-mo/yr
$30 - $(-30.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,360 $6,090 $1,850
17,400
kWh
$490
-
kW-mo/yr
$20 - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $740 $1,320 $320
3,000
kWh
$80
-
kW-mo/yr
$290 - $50
TOTAL RECOMMENDED $21,780 $51,190 $15,510
142,400
kWh
$3,550
-
kW-mo/yr
$420 $2,140 $160
TOTAL IMPLEMENTED $17,480 $24,190 $13,690
126,800
kWh
$3,210
-
kW-mo/yr
$420 - $160
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs