ITAC Assessment: CO0640
ITAC logo
ITAC Assessment: CO0640
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Plastic Bags
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 40,000
ft2
Annual Production 14,400,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,266 5,366,000
kWh
Electricity Demand $130,333 8,550
kW-mo/yr
Electricity Fees $1,752 -
Natural Gas $24,636 3,738
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,960

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,720 $1,140 $7,400
161,400
kWh
$4,320
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $8,870 $3,410 $4,990
108,800
kWh
$3,880
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,900 $2,650 $2,160
47,200
kWh
$1,740
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $18,710 $18,500 $11,920
260,100
kWh
$6,940
-
kW-mo/yr
$130 $(-280.0)
05 2.9114: Use solar heat to make electricty $1,920 $35,000 $710
15,600
kWh
$1,210
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $530 $3,060 $350
7,700
kWh
$210
-
kW-mo/yr
$20 $(-50.0)
TOTAL RECOMMENDED $45,650 $63,760 $27,530
600,800
kWh
$18,300
-
kW-mo/yr
$150 $(-330.0)
TOTAL IMPLEMENTED $30,960 $22,700 $19,670
429,200
kWh
$11,470
-
kW-mo/yr
$150 $(-330.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs