Assessment Year | 2010 |
---|---|
Principal Product | Fabricated steel |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
62,100
ft2
|
Annual Production | 2,000,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $22,742 | 567,520 |
kWh
|
$0.040 |
Electricity Demand | $60,507 | 3,674 |
kW-mo/yr
|
$16.47 |
Electricity Fees | $2,161 | - |
|
- |
Natural Gas | $15,900 | 2,070 |
MMBtu
|
$7.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,640 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,180 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,180 | $340 |
$630
12,900
kWh
|
$1,550
-
kW-mo/yr
|
- | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $1,600 | $10,320 |
$460
9,500
kWh
|
$1,140
-
kW-mo/yr
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,040 | $13,990 |
$340
7,000
kWh
|
$1,700
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,710 | $33,800 |
$3,170
65,000
kWh
|
$5,630
-
kW-mo/yr
|
$(-430.0) | $340 | |
05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,060 | $3,620 |
$210
4,300
kWh
|
$810
-
kW-mo/yr
|
$30 | $10 | |
06 | 2.9114: Use solar heat to make electricty | $2,050 | $35,000 |
$760
15,600
kWh
|
$1,290
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $17,640 | $97,070 |
$5,570
114,300
kWh
|
$12,120
-
kW-mo/yr
|
$(-400.0) | $350 | ||
TOTAL IMPLEMENTED | $2,180 | $340 |
$630
12,900
kWh
|
$1,550
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs