Assessment Year | 2010 |
---|---|
Principal Product | PVC Piping |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084: Plastics Pipe |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
69,200
ft2
|
Annual Production | 72,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $110,665 | 2,961,000 |
kWh
|
$0.037 |
Electricity Demand | $94,142 | 6,274 |
kW-mo/yr
|
$15.01 |
Electricity Fees | $1,416 | - |
|
- |
Natural Gas | $15,489 | 1,518 |
MMBtu
|
$10.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $2,090 | $1,490 |
$750
16,600
kWh
|
$1,340
-
kW-mo/yr
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,160 | $3,710 |
$980
21,700
kWh
|
$3,180
-
kW-mo/yr
|
- | - | - | |
03 | 2.2511: Insulate bare equipment | $5,490 | $14,380 |
$5,060
111,500
kWh
|
$430
-
kW-mo/yr
|
- | - | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $8,860 | $30,940 |
$5,590
123,100
kWh
|
$3,270
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,800 | $15,890 |
$12,020
264,800
kWh
|
$6,650
-
kW-mo/yr
|
- | $40 | $90 | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $9,800 | $20,470 |
$(-640.0)
(-14,100)
kWh
|
$(-370.0)
-
kW-mo/yr
|
$10,810
-
MMBtu
|
- | - | |
07 | 2.9114: Use solar heat to make electricty | $1,910 | $35,000 |
$710
15,600
kWh
|
$1,200
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $51,110 | $121,880 |
$24,470
539,200
kWh
|
$15,700
-
kW-mo/yr
|
$10,810
-
MMBtu
|
$40 | $90 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs