Assessment Year | 2010 |
---|---|
Principal Product | Asphalt roofing shingles |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $50 M to 100M |
# of Employees | 85 |
Plant Area |
180,000
ft2
|
Annual Production | 1,493,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $150,378 | 4,625,704 |
kWh
|
$0.033 |
Electricity Demand | $139,410 | 8,886 |
kW-mo/yr
|
$15.69 |
Electricity Fees | $2,061 | - |
|
- |
Natural Gas | $144,831 | 44,444 |
MMBtu
|
$3.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,710 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,860 | $24,000 |
$7,880
235,500
kWh
|
$5,980
-
kW-mo/yr
|
- | - | - | |
02 | 2.2511: Insulate bare equipment | $3,450 | $1,790 | - | - |
$3,450
-
MMBtu
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,200 | $460 |
$700
20,900
kWh
|
$500
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,650 | $20,950 |
$13,100
391,300
kWh
|
$8,750
-
kW-mo/yr
|
- | $640 | $1,160 | |
05 | 2.9114: Use solar heat to make electricty | $1,560 | $20,500 |
$490
14,600
kWh
|
$1,070
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $430 | $450 |
$80
2,500
kWh
|
$210
-
kW-mo/yr
|
- | $30 | $110 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $220 | $900 |
$30
800
kWh
|
$20
-
kW-mo/yr
|
- | $60 | $110 | |
TOTAL RECOMMENDED | $44,370 | $69,050 |
$22,280
665,600
kWh
|
$16,530
-
kW-mo/yr
|
$3,450
-
MMBtu
|
$730 | $1,380 | ||
TOTAL IMPLEMENTED | $38,710 | $45,410 |
$21,680
647,700
kWh
|
$15,230
-
kW-mo/yr
|
- | $640 | $1,160 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs