ITAC Assessment: CO0637
ITAC logo
ITAC Assessment: CO0637
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Asphalt roofing shingles
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $50
M
to 100
M
# of Employees 85
Plant Area 180,000
ft2
Annual Production 1,493,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,378 4,625,704
kWh
Electricity Demand $139,410 8,886
kW-mo/yr
Electricity Fees $2,061 -
Natural Gas $144,831 44,444
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,860 $24,000 $7,880
235,500
kWh
$5,980
-
kW-mo/yr
- - -
02 2.2511: Insulate bare equipment $3,450 $1,790 - - $3,450
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,200 $460 $700
20,900
kWh
$500
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $23,650 $20,950 $13,100
391,300
kWh
$8,750
-
kW-mo/yr
- $640 $1,160
05 2.9114: Use solar heat to make electricty $1,560 $20,500 $490
14,600
kWh
$1,070
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $430 $450 $80
2,500
kWh
$210
-
kW-mo/yr
- $30 $110
07 2.7142: Utilize higher efficiency lamps and/or ballasts $220 $900 $30
800
kWh
$20
-
kW-mo/yr
- $60 $110
TOTAL RECOMMENDED $44,370 $69,050 $22,280
665,600
kWh
$16,530
-
kW-mo/yr
$3,450
-
MMBtu
$730 $1,380
TOTAL IMPLEMENTED $38,710 $45,410 $21,680
647,700
kWh
$15,230
-
kW-mo/yr
- $640 $1,160
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs