Assessment Year | 2002 |
---|---|
Principal Product | Plastic lined pipe and fittings |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 97 |
Plant Area |
110,000
ft2
|
Annual Production | 2,500
thousand feet
|
Production Hrs. Annual | 2,788
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $247,800 | 3,776,680 |
kWh
|
$0.066 |
Electricity Demand | $84,624 | 13,716 |
kW-mo/yr
|
$6.17 |
Natural Gas | $105,370 | 10,246 |
MMBtu
|
$10.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,586 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,628 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $7,860 | $2,090 |
$5,980
103,100
kWh
|
$1,880
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,145 | $40 |
$3,175
54,760
kWh
|
$970
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,370 | $400 |
$3,370
58,100
kWh
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,290 | $4,300 |
$3,290
56,700
kWh
|
- | - | - | |
05 | 2.7124: Make a practice of turning off lights when not needed | $2,965 | - |
$2,820
48,600
kWh
|
$145
-
kW-mo/yr
|
- | - | |
06 | 2.2511: Insulate bare equipment | $2,300 | $1,335 |
$2,300
41,300
kWh
|
- | - | - | |
07 | 4.821: Pay bills on time to avoid late fees | $788 | - | - | - | $788 | - | |
08 | 2.2511: Insulate bare equipment | $500 | $600 |
$500
8,500
kWh
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $368 | $145 |
$55
980
kWh
|
$8
-
kW-mo/yr
|
- | $305 | |
TOTAL RECOMMENDED | $25,586 | $8,910 |
$21,490
372,040
kWh
|
$3,003
-
kW-mo/yr
|
$788 | $305 | ||
TOTAL IMPLEMENTED | $19,628 | $3,130 |
$15,845
273,060
kWh
|
$2,995
-
kW-mo/yr
|
$788 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs