ITAC Assessment: AM0408
ITAC logo
ITAC Assessment: AM0408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Plastic lined pipe and fittings
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 97
Plant Area 110,000
ft2
Annual Production 2,500
thousand feet
Production Hrs. Annual 2,788
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,800 3,776,680
kWh
Electricity Demand $84,624 13,716
kW-mo/yr
Natural Gas $105,370 10,246
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,586 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,628

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $7,860 $2,090 $5,980
103,100
kWh
$1,880
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,145 $40 $3,175
54,760
kWh
$970
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,370 $400 $3,370
58,100
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,290 $4,300 $3,290
56,700
kWh
- - -
05 2.7124: Make a practice of turning off lights when not needed $2,965 - $2,820
48,600
kWh
$145
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $2,300 $1,335 $2,300
41,300
kWh
- - -
07 4.821: Pay bills on time to avoid late fees $788 - - - $788 -
08 2.2511: Insulate bare equipment $500 $600 $500
8,500
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $368 $145 $55
980
kWh
$8
-
kW-mo/yr
- $305
TOTAL RECOMMENDED $25,586 $8,910 $21,490
372,040
kWh
$3,003
-
kW-mo/yr
$788 $305
TOTAL IMPLEMENTED $19,628 $3,130 $15,845
273,060
kWh
$2,995
-
kW-mo/yr
$788 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs