ITAC Assessment: CO0636
ITAC logo
ITAC Assessment: CO0636
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Tortillas and tortilla chips
NAICS 311830: Tortilla Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 261
Plant Area 33,000
ft2
Annual Production 75,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,845 5,494,320
kWh
Electricity Demand $155,740 10,290
kW-mo/yr
Electricity Fees $3,422 -
Natural Gas $474,930 72,330
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $6,080 $1,630 $3,110
74,200
kWh
$2,970
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,910 $390 $3,000
71,600
kWh
$2,910
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $3,170 $4,860 $2,110
50,500
kWh
$1,060
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $1,420 $9,910 $900
21,400
kWh
$520
-
kW-mo/yr
- -
05 2.4239: Eliminate or reduce compressed air usage $760 $4,430 $450
10,800
kWh
$310
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,460 $16,020 $5,090
121,500
kWh
$2,540
-
kW-mo/yr
$200 $(-370.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,920 $23,640 $1,310
31,200
kWh
$660
-
kW-mo/yr
$70 $880
08 2.9114: Use solar heat to make electricty $1,600 $10,500 $650
15,600
kWh
$950
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,160 $1,170 $140
3,300
kWh
$80
-
kW-mo/yr
$430 $510
TOTAL RECOMMENDED $30,480 $72,550 $16,760
400,100
kWh
$12,000
-
kW-mo/yr
$700 $1,020
TOTAL IMPLEMENTED $15,330 $17,530 $7,600
181,300
kWh
$6,790
-
kW-mo/yr
$430 $510
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs