ITAC Assessment: CO0626
ITAC logo
ITAC Assessment: CO0626
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Solar Panels and Equipment
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 200,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $404,360 9,167,002
kWh
Electricity Demand $234,804 20,593
kW-mo/yr
Electricity Fees $74,485 -
Natural Gas $14,334 2,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,520

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $46,520 $7,500 $33,180
779,400
kWh
$13,750
-
kW-mo/yr
$50 - $(-460.0)
02 2.3191: Use demand controller or load shedder $7,900 - - - - $7,900 -
03 2.9114: Use solar heat to make electricty $5,100 $45,500 $1,230
21,800
kWh
$1,040
-
kW-mo/yr
- $2,830 -
04 2.7134: Use photocell controls $2,350 $620 $1,060
21,200
kWh
$1,090
-
kW-mo/yr
$130 - $70
05 2.7111: Reduce illumination to minimum necessary levels $2,140 $360 $1,180
24,100
kWh
$860
-
kW-mo/yr
$40 - $60
06 2.6211: Conserve energy by efficient use of vending machines $370 $780 $320
7,400
kWh
$50
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $64,380 $54,760 $36,970
853,900
kWh
$16,790
-
kW-mo/yr
$220 $10,730 $(-330.0)
TOTAL IMPLEMENTED $46,520 $7,500 $33,180
779,400
kWh
$13,750
-
kW-mo/yr
$50 - $(-460.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs