ITAC Assessment: CO0623
ITAC logo
ITAC Assessment: CO0623
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Doors
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 35,000
ft2
Annual Production 27,400
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,144 1,840,400
kWh
Electricity Demand $72,552 4,768
kW-mo/yr
Electricity Fees $347 -
Natural Gas $11,068 1,330
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,250 $1,000 $3,300
89,500
kWh
$2,950
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,280 $15,890 $5,280
143,200
kWh
- -
03 2.4133: Use most efficient type of electric motors $970 $4,840 $430
11,700
kWh
$540
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,140 $8,210 $2,240
60,700
kWh
$2,820
-
kW-mo/yr
$80
05 2.9114: Use solar heat to make electricty $1,850 $17,500 $540
14,600
kWh
$1,310
-
kW-mo/yr
-
TOTAL RECOMMENDED $19,490 $47,440 $11,790
319,700
kWh
$7,620
-
kW-mo/yr
$80
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs