ITAC Assessment: CO0621
ITAC logo
ITAC Assessment: CO0621
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Tungsten metal powder
NAICS 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 7
Plant Area 11,000
ft2
Annual Production 30,900
lb
Production Hrs. Annual 2,184
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,156 1,076,872
kWh
Electricity Demand $52,065 3,088
kW-mo/yr
Electricity Fees $384 -
Natural Gas $52,649 5,505
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $310 $1,730 - - $310
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,570 $3,690 $860
22,600
kWh
$650
-
kW-mo/yr
- $30 $30
03 2.9114: Use solar heat to make electricty $1,780 $10,500 $560
14,600
kWh
$1,220
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $930 $4,360 $310
8,200
kWh
$650
-
kW-mo/yr
- $10 $(-40.0)
05 2.4133: Use most efficient type of electric motors $600 $1,010 $350
9,300
kWh
$250
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $400 $510 $90
2,400
kWh
$60
-
kW-mo/yr
- $130 $120
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $360 $650 $210
5,500
kWh
$150
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $5,950 $22,450 $2,380
62,600
kWh
$2,980
-
kW-mo/yr
$310
-
MMBtu
$170 $110
TOTAL IMPLEMENTED $1,970 $4,200 $950
25,000
kWh
$710
-
kW-mo/yr
- $160 $150
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings