ITAC Assessment: CO0611
ITAC logo
ITAC Assessment: CO0611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Fabricated glass products
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 144
Plant Area 84,300
ft2
Annual Production 5,400,000
lb
Production Hrs. Annual 7,975
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,487 8,278,441
kWh
Electricity Demand $380,205 24,519
kW-mo/yr
Electricity Fees $357 -
Natural Gas $30,873 3,778
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,560 $23,950 $5,560
156,500
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,550 $200 $2,630
74,000
kWh
$1,920
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $500 $1,755 $300
8,349
kWh
$200
-
kW-mo/yr
- - -
04 2.2437: Recover waste heat from equipment $20,810 $33,480 - - $20,810
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $18,360 $20,290 $11,610
326,800
kWh
$6,740
-
kW-mo/yr
- $450 $(-440.0)
06 2.9114: Use solar heat to make electricty $1,770 $11,000 $520
14,600
kWh
$1,250
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $51,550 $90,675 $20,620
580,249
kWh
$10,110
-
kW-mo/yr
$20,810
-
MMBtu
$450 $(-440.0)
TOTAL IMPLEMENTED $23,410 $22,245 $14,540
409,149
kWh
$8,860
-
kW-mo/yr
- $450 $(-440.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs