Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Satellites, antennas, and aerospace equipment
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range greater than $500
M
# of Employees 2,600
Plant Area 406,000
ft2
Annual Production 7
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $599,854 17,923,084
kWh
Electricity Demand $415,687 30,827
kW-mo/yr
Electricity Fees $1,695 -
Natural Gas $336,247 45,717
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,340 $13,163 $1,700
56,200
kWh
$1,640
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $1,470 $1,400 $1,090
35,900
kWh
$380
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $880 $500 $520
17,200
kWh
$360
-
kW-mo/yr
- -
04 2.7124: Make a practice of turning off lights when not needed $2,690 $15,668 $2,260
74,700
kWh
- $140 $290
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,680 $3,991 $1,090
36,200
kWh
$500
-
kW-mo/yr
$120 $(-30.0)
06 2.9114: Use solar heat to make electricty $1,610 $11,000 $440
14,600
kWh
$1,170
-
kW-mo/yr
- -
07 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $530 $500 $310
10,200
kWh
$220
-
kW-mo/yr
- -
TOTAL RECOMMENDED $12,200 $46,222 $7,410
245,000
kWh
$4,270
-
kW-mo/yr
$260 $260
TOTAL IMPLEMENTED $10,590 $35,222 $6,970
230,400
kWh
$3,100
-
kW-mo/yr
$260 $260
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs