ITAC Assessment: CO0606
ITAC logo
ITAC Assessment: CO0606
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Aerospace Components
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 240
Plant Area 110,000
ft2
Annual Production 3,272,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $345,935 11,377,356
kWh
Electricity Demand $181,485 20,771
kW-mo/yr
Electricity Fees $3,612 -
Natural Gas $75,397 6,856
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,520

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,880 $620 $4,800
164,500
kWh
$2,080
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,100 $60 $3,530
121,100
kWh
$1,570
-
kW-mo/yr
- - -
03 2.4239: Eliminate or reduce compressed air usage $3,150 $2,680 $2,180
75,000
kWh
$970
-
kW-mo/yr
- - -
04 3.3131: Use evaporation to concentrate material $1,060 $3,000 - - $1,060
-
lb
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $24,630 $69,110 $17,600
604,500
kWh
$7,130
-
kW-mo/yr
- $330 $(-430.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,790 $10,000 $2,270
77,800
kWh
$920
-
kW-mo/yr
- $70 $530
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,080 $13,670 $2,180
73,700
kWh
$1,200
-
kW-mo/yr
- $50 $(-350.0)
08 2.7135: Install occupancy sensors $1,890 $9,180 $1,250
42,900
kWh
$510
-
kW-mo/yr
- $60 $70
TOTAL RECOMMENDED $49,580 $108,320 $33,810
1,159,500
kWh
$14,380
-
kW-mo/yr
$1,060
-
lb
$510 $(-180.0)
TOTAL IMPLEMENTED $48,520 $105,320 $33,810
1,159,500
kWh
$14,380
-
kW-mo/yr
- $510 $(-180.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs