Assessment Year | 2007 |
---|---|
Principal Product | Aerospace Components |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 240 |
Plant Area |
110,000
ft2
|
Annual Production | 3,272,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $345,935 | 11,377,356 |
kWh
|
$0.030 |
Electricity Demand | $181,485 | 20,771 |
kW-mo/yr
|
$8.74 |
Electricity Fees | $3,612 | - |
|
- |
Natural Gas | $75,397 | 6,856 |
MMBtu
|
$11.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,580 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,520 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,880 | $620 |
$4,800
164,500
kWh
|
$2,080
-
kW-mo/yr
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,100 | $60 |
$3,530
121,100
kWh
|
$1,570
-
kW-mo/yr
|
- | - | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $3,150 | $2,680 |
$2,180
75,000
kWh
|
$970
-
kW-mo/yr
|
- | - | - | |
04 | 3.3131: Use evaporation to concentrate material | $1,060 | $3,000 | - | - |
$1,060
-
lb
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,630 | $69,110 |
$17,600
604,500
kWh
|
$7,130
-
kW-mo/yr
|
- | $330 | $(-430.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,790 | $10,000 |
$2,270
77,800
kWh
|
$920
-
kW-mo/yr
|
- | $70 | $530 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,080 | $13,670 |
$2,180
73,700
kWh
|
$1,200
-
kW-mo/yr
|
- | $50 | $(-350.0) | |
08 | 2.7135: Install occupancy sensors | $1,890 | $9,180 |
$1,250
42,900
kWh
|
$510
-
kW-mo/yr
|
- | $60 | $70 | |
TOTAL RECOMMENDED | $49,580 | $108,320 |
$33,810
1,159,500
kWh
|
$14,380
-
kW-mo/yr
|
$1,060
-
lb
|
$510 | $(-180.0) | ||
TOTAL IMPLEMENTED | $48,520 | $105,320 |
$33,810
1,159,500
kWh
|
$14,380
-
kW-mo/yr
|
- | $510 | $(-180.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs