ITAC Assessment: CO0602
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Wood Doors & Architectural Millwork
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 70,000
ft2
Annual Production 18,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,364 1,496,960
kWh
Electricity Demand $76,273 5,359
kW-mo/yr
Electricity Fees $322 -
Natural Gas $8,146 1,000
MMBtu
Fuel Oil #2 $88,400 4,267
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,797

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,270 $89,570 $4,680
195,100
kWh
$7,590
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,220 $610 $1,720
71,900
kWh
$1,500
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $1,460 - $1,460
60,900
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,220 $3,430 $660
27,300
kWh
$560
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $117 $276 $45
1,863
kWh
$72
-
kW-mo/yr
- -
06 2.8226: Increase efficiency of trucks $5,040 - - - $5,040
-
MMBtu
-
07 2.9114: Use solar heat to make electricty $1,290 $11,000 $350
14,600
kWh
$940
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $600 $2,270 $150
6,100
kWh
$470
-
kW-mo/yr
- $(-20.0)
09 2.7135: Install occupancy sensors $50 $200 $30
1,200
kWh
$20
-
kW-mo/yr
- -
TOTAL RECOMMENDED $25,267 $107,356 $9,095
378,963
kWh
$11,152
-
kW-mo/yr
$5,040
-
MMBtu
$(-20.0)
TOTAL IMPLEMENTED $4,797 $886 $3,225
134,663
kWh
$1,572
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs