ITAC Assessment: CO0598
ITAC logo
ITAC Assessment: CO0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Aluminum beverage containers
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 330,000
ft2
Annual Production 3,200,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,695,916 47,784,906
kWh
Electricity Demand $894,041 69,935
kW-mo/yr
Electricity Fees $1,566 -
Natural Gas $1,322,170 147,235
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $141,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1113: Reduce combustion air flow to optimum $77,320 $140,620 $4,720
146,100
kWh
$2,720
-
kW-mo/yr
$69,880
-
MMBtu
-
02 2.1116: Improve combustion control capability $37,380 $112,000 - - $37,380
-
MMBtu
-
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $15,090 $338,400 $46,010
1,423,100
kWh
$27,800
-
kW-mo/yr
$(-32,320.0)
-
MMBtu
$(-26,400.0)
04 2.4131: Size electric motors for peak operating efficiency $8,960 $14,520 $5,690
176,100
kWh
$3,270
-
kW-mo/yr
- -
05 2.1213: Direct warmest air to combustion intake $1,660 $4,250 - - $1,660
-
MMBtu
-
06 2.9114: Use solar heat to make electricty $1,310 $11,000 $470
14,600
kWh
$840
-
kW-mo/yr
- -
TOTAL RECOMMENDED $141,720 $620,790 $56,890
1,759,900
kWh
$34,630
-
kW-mo/yr
$76,600
-
MMBtu
$(-26,400.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs