ITAC Assessment: CO0584
ITAC logo
ITAC Assessment: CO0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Robotic welders
NAICS 333992: Welding and Soldering Equipment Manufacturing
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 107,250
ft2
Annual Production 50
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,624 2,455,200
kWh
Electricity Demand $74,699 8,691
kW-mo/yr
Electricity Fees $324 -
Natural Gas $10,231 9,495
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $210 - $210
10,800
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,220 $31,750 $4,490
236,100
kWh
$11,010
-
kW-mo/yr
- $440 $280
03 2.9111: Use solar heat to heat make-up air $3,480 $21,810 - - $3,480
-
MMBtu
- -
04 2.7232: Replace existing hvac unit with high efficiency model $2,130 $16,160 - - $2,130
-
MMBtu
- -
05 2.9114: Use solar heat to make electricty $1,500 $2,950 $270
14,100
kWh
$1,230
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $820 $740 $80
4,100
kWh
$110
-
kW-mo/yr
- $140 $490
TOTAL RECOMMENDED $24,360 $73,410 $5,050
265,100
kWh
$12,350
-
kW-mo/yr
$5,610
-
MMBtu
$580 $770
TOTAL IMPLEMENTED $16,220 $31,750 $4,490
236,100
kWh
$11,010
-
kW-mo/yr
- $440 $280
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs