Assessment Year | 2005 |
---|---|
Principal Product | Roofing asphalt |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 16 |
Plant Area |
13,100
ft2
|
Annual Production | 85,400
ton
|
Production Hrs. Annual | 8,160
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $61,230 | 1,880,960 |
kWh
|
$0.033 |
Electricity Demand | $54,839 | 3,998 |
kW-mo/yr
|
$13.72 |
Electricity Fees | $212 | - |
|
- |
Natural Gas | $464,300 | 71,415 |
MMBtu
|
$6.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $511,150 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,700 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.113: Install refrigeration system to cool product | $479,740 | $28,080 | - | - | - |
$(-2,320.0)
-
Tgal
|
$(-170,200.0) | - |
$(-2,000.0)
-
Tgal
|
$654,260 | |
02 | 2.2135: Repair and eliminate steam leaks | $10,650 | $500 | - | - |
$10,650
-
MMBtu
|
- | - | - | - | - | |
03 | 2.2511: Insulate bare equipment | $9,880 | $3,190 | - | - |
$9,880
-
MMBtu
|
- | - | - | - | - | |
04 | 2.2121: Increase amount of condensate returned | $3,750 | $12,850 | - | - |
$2,670
-
MMBtu
|
$580
-
Tgal
|
- | - |
$500
-
Tgal
|
- | |
05 | 2.1213: Direct warmest air to combustion intake | $3,310 | $980 | - | - |
$3,310
-
MMBtu
|
- | - | - | - | - | |
06 | 3.4114: Replace city water with recycled water via cooling tower | $1,460 | $9,360 |
$(-850.0)
(-26,100)
kWh
|
$(-540.0)
-
kW-mo/yr
|
- |
$1,530
-
Tgal
|
- | - |
$1,320
-
Tgal
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $50 | $20 |
$30
880
kWh
|
$20
-
kW-mo/yr
|
- | - | - | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $900 | $1,610 |
$430
13,100
kWh
|
$270
-
kW-mo/yr
|
- | - | - | $200 | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $660 | $1,830 |
$360
1,100
kWh
|
$230
-
kW-mo/yr
|
- | - | - | $70 | - | - | |
10 | 2.9113: Use solar heat for heat | $470 | $1,400 |
$470
14,500
kWh
|
- | - | - | - | - | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $280 | $500 |
$150
4,700
kWh
|
$100
-
kW-mo/yr
|
- | - | $20 | $10 | - | - | |
TOTAL RECOMMENDED | $511,150 | $60,320 |
$590
8,180
kWh
|
$80
-
kW-mo/yr
|
$26,510
-
MMBtu
|
$(-210.0)
-
Tgal
|
$(-170,180.0) | $280 |
$(-180.0)
-
Tgal
|
$654,260 | ||
TOTAL IMPLEMENTED | $18,700 | $16,680 |
$540
6,680
kWh
|
$350
-
kW-mo/yr
|
$16,630
-
MMBtu
|
$580
-
Tgal
|
$20 | $80 |
$500
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs