ITAC Assessment: CO0580
ITAC logo
ITAC Assessment: CO0580
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Roofing asphalt
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 16
Plant Area 13,100
ft2
Annual Production 85,400
ton
Production Hrs. Annual 8,160
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,230 1,880,960
kWh
Electricity Demand $54,839 3,998
kW-mo/yr
Electricity Fees $212 -
Natural Gas $464,300 71,415
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $511,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings
01 4.113: Install refrigeration system to cool product $479,740 $28,080 - - - $(-2,320.0)
-
Tgal
$(-170,200.0) - $(-2,000.0)
-
Tgal
$654,260
02 2.2135: Repair and eliminate steam leaks $10,650 $500 - - $10,650
-
MMBtu
- - - - -
03 2.2511: Insulate bare equipment $9,880 $3,190 - - $9,880
-
MMBtu
- - - - -
04 2.2121: Increase amount of condensate returned $3,750 $12,850 - - $2,670
-
MMBtu
$580
-
Tgal
- - $500
-
Tgal
-
05 2.1213: Direct warmest air to combustion intake $3,310 $980 - - $3,310
-
MMBtu
- - - - -
06 3.4114: Replace city water with recycled water via cooling tower $1,460 $9,360 $(-850.0)
(-26,100)
kWh
$(-540.0)
-
kW-mo/yr
- $1,530
-
Tgal
- - $1,320
-
Tgal
-
07 2.4133: Use most efficient type of electric motors $50 $20 $30
880
kWh
$20
-
kW-mo/yr
- - - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $900 $1,610 $430
13,100
kWh
$270
-
kW-mo/yr
- - - $200 - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $660 $1,830 $360
1,100
kWh
$230
-
kW-mo/yr
- - - $70 - -
10 2.9113: Use solar heat for heat $470 $1,400 $470
14,500
kWh
- - - - - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $280 $500 $150
4,700
kWh
$100
-
kW-mo/yr
- - $20 $10 - -
TOTAL RECOMMENDED $511,150 $60,320 $590
8,180
kWh
$80
-
kW-mo/yr
$26,510
-
MMBtu
$(-210.0)
-
Tgal
$(-170,180.0) $280 $(-180.0)
-
Tgal
$654,260
TOTAL IMPLEMENTED $18,700 $16,680 $540
6,680
kWh
$350
-
kW-mo/yr
$16,630
-
MMBtu
$580
-
Tgal
$20 $80 $500
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs