ITAC Assessment: CO0577
ITAC logo
ITAC Assessment: CO0577
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Construction equipment
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range greater than $500
M
# of Employees 800
Plant Area 367,000
ft2
Annual Production 20,250
pieces
Production Hrs. Annual 8,760
hrs
Location (State) North Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $843,948 35,616,000
kWh
Electricity Demand $402,663 63,648
kW-mo/yr
Electricity Fees $83,054 -
Natural Gas $815,026 119,829
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $457,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $277,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $141,620 $513,000 $106,650
3,878,100
kWh
$34,970
-
kW-mo/yr
- - - -
02 2.3212: Optimize plant power factor $135,890 $303,800 $32,940
1,780,800
kWh
$19,900
-
kW-mo/yr
$83,050 - - -
03 2.1122: Re-size charging openings or add a movable door on equipment $89,400 $41,000 - - - $89,400
-
MMBtu
- -
04 4.426: Modify workload $48,020 $360 $1,220
66,600
kWh
- - - $46,800 -
05 2.2711: Utilize outside air instead of conditioned air for drying $3,420 $6,000 $2,340
126,300
kWh
$1,080
-
kW-mo/yr
- - - -
06 2.4133: Use most efficient type of electric motors $270 $340 $180
9,529
kWh
$90
-
kW-mo/yr
- - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $810 $3,070 $520
28,500
kWh
$290
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $38,530 $150,890 $25,740
1,391,600
kWh
$11,920
-
kW-mo/yr
- - $(-590.0) $1,460
TOTAL RECOMMENDED $457,960 $1,018,460 $169,590
7,281,429
kWh
$68,250
-
kW-mo/yr
$83,050 $89,400
-
MMBtu
$46,210 $1,460
TOTAL IMPLEMENTED $277,000 $351,500 $36,680
1,983,229
kWh
$21,070
-
kW-mo/yr
$83,050 $89,400
-
MMBtu
$46,800 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs