ITAC Assessment: CO0539
ITAC logo
ITAC Assessment: CO0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Turkey feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 21
Plant Area 17,500
ft2
Annual Production 240,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,272 5,253,737
kWh
Electricity Demand $173,518 13,456
kW-mo/yr
Electricity Fees $192 -
Natural Gas $188,602 34,187
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,190

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $20,330 $80,800 $15,720
543,800
kWh
$4,610
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $1,250 $696 $729
25,207
kWh
$521
-
kW-mo/yr
-
03 2.1213: Direct warmest air to combustion intake $3,300 $5,180 - - $3,300
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,990 $4,580 $1,090
37,700
kWh
$900
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $650 $1,370 - - $650
-
MMBtu
TOTAL RECOMMENDED $27,520 $92,626 $17,539
606,707
kWh
$6,031
-
kW-mo/yr
$3,950
-
MMBtu
TOTAL IMPLEMENTED $7,190 $11,826 $1,819
62,907
kWh
$1,421
-
kW-mo/yr
$3,950
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs