Assessment Year | 2003 |
---|---|
Principal Product | Lithographic printing plates |
NAICS | 333244: Printing Machinery and Equipment Manufacturing |
SIC | 3555: Printing Trades Machinery and Equipment |
Sales Range | $100 M to 500M |
# of Employees | 220 |
Plant Area |
370,100
ft2
|
Annual Production | 180,000
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $918,338 | 24,104,000 |
kWh
|
$0.038 |
Natural Gas | $93,699 | 24,528 |
MMBtu
|
$3.82 |
Other Energy | $780,326 | 177,448 |
MMBtu
|
$4.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,920 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,792 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4323: Use optimum size and capacity equipment | $21,790 | $37,580 |
$21,790
571,900
kWh
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,240 | $33,710 |
$13,240
347,400
kWh
|
- | - | |
03 | 2.7144: Install spectral reflectors / delamp | $8,350 | $1,640 |
$6,480
170,200
kWh
|
$120 | $1,750 | |
04 | 2.7132: Install timers on light switches in little used areas | $8,180 | $3,150 |
$6,870
180,300
kWh
|
$685 | $625 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,602 | $5,670 |
$3,993
104,665
kWh
|
- | $1,609 | |
06 | 2.4239: Eliminate or reduce compressed air usage | $3,060 | $580 |
$(-1,380.0)
(-36,200)
kWh
|
- | $4,440 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,398 | $6,640 |
$2,884
75,686
kWh
|
- | $(-486.0) | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $980 | $3,300 |
$980
25,600
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $320 | $586 |
$701
18,396
kWh
|
- | $(-381.0) | |
TOTAL RECOMMENDED | $63,920 | $92,856 |
$55,558
1,457,947
kWh
|
$805 | $7,557 | ||
TOTAL IMPLEMENTED | $49,792 | $83,410 |
$46,873
1,229,865
kWh
|
$685 | $2,234 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs