Assessment Year | 2003 |
---|---|
Principal Product | Concrete pipe & prestressed concrete products |
NAICS | 327332: Concrete Pipe Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $100 M to 500M |
# of Employees | 135 |
Plant Area |
46,800
ft2
|
Annual Production | 230,000
ton
|
Production Hrs. Annual | 5,408
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $32,308 | 1,959,601 |
kWh
|
$0.016 |
Electricity Demand | $99,441 | 7,893 |
kW-mo/yr
|
$12.60 |
Electricity Fees | $1,665 | - |
|
- |
Natural Gas | $175,144 | 32,217 |
MMBtu
|
$5.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,726 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,120 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $19,740 | $12,000 |
$5,350
232,900
kWh
|
$14,390
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,270 | $19,440 |
$4,440
193,300
kWh
|
$5,680
-
kW-mo/yr
|
- | $150 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,990 | $230 |
$3,380
147,300
kWh
|
$4,330
-
kW-mo/yr
|
- | $(-720.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,122 | $12,500 |
$2,228
97,070
kWh
|
$2,090
-
kW-mo/yr
|
- | $(-196.0) | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $4,120 | $11,840 |
$(-160.0)
(-6,800)
kWh
|
$(-120.0)
-
kW-mo/yr
|
$4,400
-
MMBtu
|
- | |
06 | 2.2135: Repair and eliminate steam leaks | $1,130 | $210 | - | - |
$1,130
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $144 | $266 |
$40
1,710
kWh
|
$92
-
kW-mo/yr
|
- | $12 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $210 | $490 |
$110
4,806
kWh
|
$144
-
kW-mo/yr
|
- | $(-44.0) | |
TOTAL RECOMMENDED | $46,726 | $56,976 |
$15,388
670,286
kWh
|
$26,606
-
kW-mo/yr
|
$5,530
-
MMBtu
|
$(-798.0) | ||
TOTAL IMPLEMENTED | $8,120 | $440 |
$3,380
147,300
kWh
|
$4,330
-
kW-mo/yr
|
$1,130
-
MMBtu
|
$(-720.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs